Shrewsbury Street Roadworks – 11 to 13 Feb. 2019
The following information about disruption on Shrewsbury Street over the next three days has recently been posted on roadworks.org.
Shrewsbury Street, Hodnet
11 February — 13 February
Delays likely Traffic control (multi-way signals)
Works location: From 24 to 26 Shrewsbury Street, Hodnet
Works description: MJ Quinns are to run approx. 25m of ducting from pcp floor box to DSLAM floor box
Responsibility for works: Openreach
Works reference: BC005MQ1W00000HODNETPCP2